Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 1, 2024

January 1, 2025

January 1, 2026

980 Reeder Ln

Addition, Demolition, Renovation, Site Work

No Information to Display

$5,900,000.00

Public - City

img_map_placeholder

980 Reeder Ln, Forney, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe to View Full Documents

Proposals for FORNEY FIRE STATION #2 RENOVATIONS Estimate: 5,900,000.00 Scope of Work: Existing Fire Station #2, in service since 2016, is to have renovations and additions to include, but limited to, the following: Addition of new apparatus bay with mezzanine above to accommodate storage and training area. Reconfiguration of existing apparatus bay to allow addition of new overhead door resulting in additional drive through bay for apparatus. Addition of Training/Hose Tower. Additional Public and Fire Fighter parking. Relocation of equipment, extractor, SCBA, and tool room to better utilize space and enhance environmental safety. New Exercise Room and relocation of existing sauna. Relocation of Decontamination area and reconfigure Bunker Gear storage. Renovation of outdoor patio area providing cover and new privacy fence. Interior renovations will include additional bunk rooms, Captain's quarters, new restrooms, Kitchen renovation, paint, and flooring. Please note this will be a phased project under one mobilization of the General Contractor. All work will need to be closely scheduled and coordinated with the Forney Fire Department to avoid any service disruptions to the community. The deadline to ask questions is 9/24/2024 12:00 PM CST Bidders are required to provide all materials, equipment, and labor required for the construction of the project along with a Payment, Performance, and a 2-year Maintenance Bond in the amount of the Contract. The effective date of the maintenance period will commence upon the date of project acceptance by the City of Forney. The successful Bidder will be required to furnish not only a performance bond in the amount of the Contract but also a payment bond for the protection of all claimants supplying labor and materials.

30 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.