Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 19, 2025

August 19, 2025

1610 Illinois St

Renovation

No Information to Display

$1,000,000.00

Public - State/Provincial

img_map_placeholder

1610 Illinois St, Golden, CO

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Reference Number 0000362692 Job Location: Golden, Colorado Colorado School of Mines (Mines), an exemplary institution in science and engineering and the state's oldest public institution of higher education, is seeking Architect / Engineer qualifications for a Capital Maintenance (CM) project on campus at Brown Hall (BH) to replace a portion of the roof. The Colorado School of Mines (Mines) seeks Architect / Engineer qualifications for a Capital Maintenance (CM) project on campus at Brown Hall (BH) to replace a portion of the roof. Brown Hall houses classrooms, laboratories, offices and shop spaces. The roofing system on the older portion (east roof) of the building is over 30 years old and is beyond its useful life. The roof system includes insulation, waterproofing materials, roof curbs, flashings and roof drains/scuppers. Deterioration of the roof is evident on roof curbs, flashings, and walk paths. Failure of these components has resulted in leaks and water damage. During the wet June of 2023, multiple roof leaks developed over an egress stairwell, and faculty offices. This project will remove and replace the roofing system on the east portion of the building. This will include proper identification, removal, and disposal of asbestos containing elements, specifications for the proper details including roof curbs, flashing, and penetrations, as well as, the appropriate levels of roof insulation. This project will be accomplished in a single phase to address this continuous roof section. Per State requirements, a percentage of the funds will be used to improve ADA accessibility to bathroom sinks in an older portion of a building adjacent to Brown Hall. Firms with demonstrated relevant experience, including at least two projects of similar size and complexity, are encouraged to apply. Relevant projects should be with local staff. The project delivery method is Design-Bid-Build (DBB). This project will be delivered in a single phase with a construction budget of approximately $1,000,000. Question Deadline 09/19/2024 at 3:00 PM MT Questions are submitted online No

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.