Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

October 1, 2024

No Information to Display

4272 Milton Ave

Renovation

No Information to Display

$530,000.00

Public - County

img_map_placeholder

4272 Milton Ave, Camillus, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

Furnish Crane Monorail Replacement and Hoist Install Question Deadline 09/12/2024 Please address any and all questions, in writing, to Deborah Magaro-Dolan, Specification Writer, Division of Purchase at deborahmagarodolan@ongov.net Contractor Requirements: Contractor shall abide by all OSHA Rules and Regulations including all applicable Covid -19 rules and regulations per New York State. All workers must adhere to all required safety measures when in any building and while working. The Contractor shall remove all service materials and debris from the site when the work included in the Contract is completed and leave the site in a neat, restored condition. The Contractor shall provide all labor, materials, and equipment to load, transport and dispose of refuse at no additional cost to the County. Contractor is responsible for all appropriate signage necessary when working. The Contractor represents and warrants that he is familiar with all Federal, State, County and Municipal Laws, ordinances, and regulations, which may in any way affect the work or those employed therein, including, but not limited to, any special acts relating to the work or to the project of which it is a part. The Contractor shall be solely responsible for complying with the requirements of all applicable Federal and State Occupational Safety and Health Act provisions and requirements of any and all other laws, rules and regulations pertaining to employee health, safety, and accident prevention. Scope of Work 1. Pre-Construction Activities I. Site Assessment - Awarded vendor will conduct a thorough inspection of the existing crane rail system to identify structural concerns. Previous inspection reports conducted for the County will be provided to the winning bidder. II. Design and Planning - Develop detailed Engineering plans for the rail replacement and hoist installation, specifically detailing replacement anchor points in the ceiling. This shall include Engineering stamped drawings of rail, anchor detail, and overall configuration of the crane system. a. It is our intention to not install the new monorail in a similar fashion to what currently exists. Anchor points for monorail shall be installed directly into the ceiling overhead. III. Material Procurement - Source and acquire all necessary materials and equipment for the project.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.