Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 20, 2024
October 8, 2024
December 18, 2024
77-230 Kamehameha Hwy
Site Work
No Information to Display
$195,000.00
Public - State/Provincial
77-230 Kamehameha Hwy, Mililani, HI
The Contractor shall provide all labor, tools, equipment and materials to perform all work related to demolishing a 600 ft stretch of fence then constructing a perimeter chain link fence for part of the Property Boundary, as shown in other attachments on HIePRO. This new fence is to include one double-swing gate. All fencing must meet NAVFAC Unified Facilities Criteria (UFC) for Fences and Gates; pages UFC 700-702 are attached and detail how posts, braces, gates, etc. are to be laid out and installed. Contractor must clear all vegetation 10 ft on each side of the existing fence path. DEMOLITION AND VEGETATION REMOVAL Contractor must demolish existing fence and posts down to the existing footings. After the fence is removed, contractor must clear approximately .23 acres of vegetation (trees, shrubbery, etc.) INSTALLATION Contractor shall install approximately 600 linear feet (LF) of new 8' high chain link fence with three strands of barbed wire on the top. All posts must be anchored 3 feet below grade with a 10" diameter of concrete for Line Posts and a 12" diameter of concrete for Terminal Posts. Each post must have a top cap with a 16" B.W. fitting extension. Barbed Wire strands are to be installed on the aforementioned fittings 5" apart. All material is to be PVC-coated and galvanized. No existing materials, including post footings, shall be utilized to construct the new fence. Contractor is responsible for Field Verification of the location of the new fence with the Owner prior to installation. Contact Person Barbour, James L Jr Email james.l.barbour@hawaii.gov Phone 808-369-3492 All Request for Information (RFI) questions and Substitution Requests shall be submitted in HIePRO no later than September 4, 2024, at 4:30 p.m., HST.. Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility of this Solicitation (Including the appendices and exhibits to this Document, and any other document related to this Solicitation), to: Barbour, James L Jr. Question Due Date & Time 09/13/2024 02:00 PM
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Mililani, HI
Bid Date: Oct 14 2024
Mililani, HI
Bid Date: Aug 23 2023
Honolulu, HI
Bid Date: Oct 28 2024
Honolulu, HI
Bid Date: Oct 02 2024
Honolulu, HI
Bid Date: Sep 20 2024
Waipahu, HI
Bid Date: Oct 16 2024
Honolulu, HI
Bid Date: Sep 23 2024
Makawao, HI
Bid Date: Oct 09 2024
Kailua Kona, HI
Bid Date: Oct 15 2024
Waikoloa, HI
--
Honokaa, HI
--
Kailua Kona, HI
--
Honolulu, HI
Bid Date: Nov 01 2024
Kula, HI
Bid Date: Sep 23 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
