Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 25, 2024

October 25, 2024

No Information to Display

1732 Foster Ave

Renovation

No Information to Display

$70,000.00

Public - City

img_map_placeholder

1732 Foster Ave, Schenectady, NY

12

3

4

Subscribe to View Full Documents

Reference Number 0000362268 Requesting bids for the repair and replacement of chilled water piping requested by the Facilities Department. The intent of these specifications is to furnish information to responsible bidders for the purpose of obtaining bids for the repair and replacement of chilled water piping as requested by the Facilities Department Question Deadline 09/20/2024 at 12:00 PM ET Questions are submitted online No General Requirements - Bid Deposit Required - Certification/Training - Certified Payroll - Contractors License Required - Installation Required - Insurance Required - Material Safety Data Sheets Required - Onsite Maintenance Required - Prevailing Wage Required - Safety Standards Plan - Spill Containment Plan - Training Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % WOMEN, MINORITY AND SERVICE DISABLED VETERAN OWNED BUSINESSES ARE ENCOURAGED TO SUBMIT PROPOSALS. Schenectady is an Equal Opportunity Employment/Affirmative Action employer. *The right is reserved to reject any and all proposals or any part thereof. The Contractor shall remove all piping insulation from the chilled water piping system. The contractor shall disconnect power from and remove pumps P-5 and P-6 serving the chilled water system in Boiler Room 117. The contractor shall disconnect and retain glycol injection system, expansion tank EXP-2 and air separator AS-2 for reinstallation. Contractor shall remove isolation valves and triple duty valves. Contractor shall remove and retain strainer for reinstallation, new strainer screens shall be provided. The contractor shall remove and replace in like size the chilled water piping and pumps within Boiler Room 117. The contractor shall replace P-5-and P-6 in Boiler Room 117 in like kind. Provide new isolation valves and triple duty valve. The contractor shall reinstall expansion tank, air separator, strainer, and reconnect glycol injection system. The contractor shall remove all grooved end pipe fittings and joints from the chilled water piping system. The contractor shall replace all pipe fittings and joints with welded or threaded joints, refer to specifications. Contractor shall thoroughly flush piping system by circulating with rinsewater for 6hours and flushing until rinse water is clear of any suds or solids and pH is matching that of the entering rinse water. Contractor shall conduct hydrostatic pressure test of system at 1.5 times the system pressure or 100psig whichever is greater for a minimum of 15minutes. Any deficiencies shall be repaired and test repeated until satisfactorily passed. Upon completion of the pressure test the contractor shall insulate the entire chilled water piping system. Contractor shall refill chilled water system with new 30% propylene glycol and fill glycol injection system tank. After completion of system filling contractor shall balance pumps and air handling units to original construction design values as indicated on the reference drawings. Current Goals MBE 11.5% WBE 11.5%

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects