Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2024

November 1, 2024

May 14, 2025

400 SW 258th St

Renovation

No Information to Display

$2,000,000.00

Public - County

img_map_placeholder

400 SW 258th St, Newberry, FL

18

15

Subscribe to View Full Documents

SUMMARY OF WORK: The proposed work for the Building Envelope and HVAC Improvements at Building 02 at Newberry High School includes, but is not limited to, the following: Allowances, cutting and patching, selective structure demolition, concrete forming and accessories, concrete reinforcing, cast-in-place concrete, concrete finishing, masonry mortaring and grouting, reinforced unit masonry, metal fabrications, blanket insulation, foamed-in-place insulation, sheet metal flashing and trim, joint protection, aluminum-framed entrances and storefronts, glazing, gypsum board assemblies, nonstructural metal framing and painting and coating and mechanical and electrical work as indicated on the documents. TIME OF COMPLETION. Time is of the essence. Task Order award will be made on October 15th, 2024. The Notice to Proceed will be issued shortly thereafter. The Work shall be Substantially Complete no later than May 14, 2025 two-hundred ten (210) calendar days from the date of the Notice to Proceed. Final Completion shall be fourteen (14) calendar days following Substantial Completion. As of September 24, 2024, construction is expected to start November 1, 2024. PAYMENT/PERFORMANCE Bonds in the form prescribed by AIA Document A312, in the amount of 100% of the Task Order amount, shall be required for quotations over $200,000. LIQUIDATED DAMAGES in the amount of $500.00 per day shall be paid by qualified Offeror to SBAC

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects