Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

November 20, 2024

August 17, 2025

Multiple Locations

Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

Multiple Locations, Castle Rock, CO

11

10

2

7

Subscribe to View Full Documents

Reference Number 0000362593 The work to be performed under this contract generally includes stream channel improvements at the MCMurdo Gulch - (Reach 1, 2 and 3) and (Tributarys 5 and 6) locations, consisting of Grading, Water Control, Unclassified Excavation, Boulder Cascade, Bank Protection, Riffle Drops and Pools, Type H Void-Filled Riprap, Type M Void-Filled Riprap, Boulder Steps, Landscape, Erosion Control, Sediment Control and related Appurtenances. All work required for the project shall be in accordance with Town of Castle Rock Contract Documents for McMurdo Gulch Stream Reclamation Project - Priority 3 Improvements and the latest editions of the Town of Castle Rock Construction Methodology and Materials Manual, Town of Castle Rock Details, Town of Castle Rock Temporary Erosion and Sediment Control (TESC) Manual, Town of Castle Rock Standard Operation Procedures (SOPs) and Mile High Flood District (MHFD) Technical Specifications. Online. Contractor shall verify actual field conditions prior to construction. It is strongly recommended that the prospective bidders investigate the site of work sufficiently to satisfy themselves of the extent and conditions of the project. Contractor will be required to coordinate construction activities with adjacent property owners, trash removal companies, school district and other Town maintenance projects if applicable. The Contractor is responsible for obtaining State Stormwater Discharge and Dewatering permits, as applicable. The Contractor shall also obtain Construction and TESC permits with the Town. There are no fees associated with these Town permits. The Town anticipates a Notice of Award on or around November 20, 2024. The contractor shall commence work no later than ten (10) calendar days from, and including, the date of the Notice to Proceed. Once work has commenced the Contractor shall complete work and should not leave the project. Work shall be substantially complete within two hundred seventy (270) calendar days of the Notice to Proceed. Question Deadline 09/19/2024 at 4:00 PM MT Questions are submitted online No, Direct questions to Frank N. Main, Project Manager, Town of Castle Rock (fmain@crgov.com). All questions related to the Bid shall be submitted via electronic mail (email) A Bid Guarantee in an amount equal to 5% of the total Bid amount is required at the time of the Bid Opening. The Guarantee must be a certified check payable to the Town of Castle Rock or a satisfactory Bid Bond executed by the Bidder. If awarded the project, a Performance Bond, Labor and Material Payment Bond and Warranty Bond are required within ten (10) days of the date the written Notice of Award, each for the total amount of the Contract Price. No Bidder may withdraw a Bid for a period of forty-five (45) days after the date fixed for opening the Bids. The Town of Castle Rock reserves the right to cancel this Invitation to Bid; reject any Bid, in whole or in part; to adjust the quantity of Work to be done as mandated by budgetary requirements; and to waive informalities or irregularities in the Bids received; when it is in the Town's best interest to do so.

89 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.