Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2024

January 21, 2025

November 21, 2025

108 Hamilton Ln

New Construction, Outdoor Lighting, Paving, Site Work

No Information to Display

$50,000,000.00

Public - State/Provincial

img_map_placeholder

108 Hamilton Ln, Bensenville, IL

1014

25

Subscribe to View Full Documents

The work under this contract includes earthwork and grading, bridge and retaining wall construction, approach lighting with sequence flashing (ALSF) light bar station relocation and control system modifications, electrical cable removal and replacement, airport operation area fence and perimeter road construction, box culvert reconstruction, drainage improvements, erosion control, landscaping, intelligent transportation system (ITS) installation, traffic control and other miscellaneous work. Question Deadline 10/04/2024 at 2:00 PM CT Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4658D.4761_Questions@docs.e-builder.net Bidders may be required to be pre-qualified by the Illinois Department of Transportation (IDOT). IDOT Prequalification required: Yes The work to be done under this contract shall be started on or about January 21, 2025. All work under this contract shall be completed by November 21, 2025. The location of the services to be performed for this contract is the Elgin O'Hare Western Access (I-490) between Mile Post 1.0 and Mile Post 2.6 in DuPage County and Cook County, Illinois. The work under this contract includes earthwork and grading, bridge and retaining wall construction, approach lighting with sequence flashing (ALSF) light bar station relocation and control system modifications, electrical cable removal and replacement, airport operation area fence and perimeter road construction, box culvert reconstruction, drainage improvements, erosion control, landscaping, intelligent transportation system (ITS) installation, traffic control and other miscellaneous work. The intended schedule is: 9:15 a.m. to 9:30 a.m. - Arrive and park at 108 Hamilton Lane in Bensenville on the north side of South Access Road (Meeting Site), see attached location map. 9:30 a.m. to 10:30 a.m. - Escorted walk-through at various locations within the project limits including Site 1 and Site 2 11:00 am - Conclusion of site walk-through and return to parking area.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.