Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

No Information to Display

7425 Garfield Ave

Renovation

No Information to Display

$114,500.00

Public - City

img_map_placeholder

7425 Garfield Ave, Bell Gardens, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe to View Full Documents

SCOPE OF WORK 1. Run power & conduit, install a new 200amp electrical in kitchen (turn key) all affected areas to be patched and painted. 2. Electrical panel to be recessed in the wall 3. 200 amp Panel to Square D or Siemens 4. Contractor will have to provide and coordinate an abatement contractor for the opening of wall and roof. 5. Plaster and paint are positive with asbestos and lead . 6. All roof penetration needs to be done pert Tremco specs. All roof work done needs to done by a authorized Tremco installer. 7. All repairs are to be completed following District-specified requirements. 8. All materials are to be completed following District-specified requirements. 9. Protect repair area from site personnel and students. 10. Work to be done after school hours or on weekends. 11. Open areas and construction left open overnight must be covered and secured. 12. Locate utilities before starting work at each site. 13. Notify District representative prior to a shutdown (If required). 14. All work must be inspected/tested after installation to ensure proper equipment operation. 15. Any changes or deviations from the scope require Management approval in writing.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.