Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

November 14, 2024

5 Wing Goose Bay

Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

5 Wing Goose Bay, Happy Valley-Goose Bay, NL

15

19

4

Subscribe to View Full Documents

Closing Time: 2:30 PM (NT) ** Please note that there has been 4 addendum issued for this project. ** Question Acceptance Deadline Sep 16, 2024 12:00 AM ADT Work of this Contract comprises of the construction of a fenced compound & electrical infrastructure for development of communication site , at 5 Wing, Goose Bay, NL. Work of this Contract comprises of the construction of a fenced compound and electrical infrastructure for development of a communications site, at 5 Wing, Goose Bay, Newfoundland and Labrador; and further identified in the drawings and specifications and as outlined below, including but not limited to: .1 The relocation and installation of an existing 80kW/100kVA, 120/208V, 3P containerized APU. .2 The supply and installation of grounding electrodes and conductors. .3 The supply and installation of underground power and communication conduits and cabling. .4 The supply and installation of one 200A, 120/208V, 3P, 4W panelboard. .5 The supply and installation of fence mounted luminaires. .6 The supply and installation of a concrete pad to mount the existing relocated containerized APU. 7 The supply and installation of a concrete pad and bollards to serve as a fuel Product Transfer Area (PTA). .8 Supply and installation of a 2,270 Liter fuel oil storage tank and associated fuel distribution system to serve the APU. .9 Testing and commissioning of all equipment (both new and existing equipment) and systems installed per this contract. Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects