Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 7, 2024

November 6, 2024

February 5, 2025

Multiple Locations

Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

Multiple Locations, Moreno Valley, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe to View Full Documents

The City of Moreno Valley, ("City") invites and will receive sealed Bids for the furnishing of all labor, equipment, materials, tools, services, transportation, permits, utilities, and all other items necessary for FIELD RENOVATIONS at five (5) ballfields at three (3) parks within the City's Park system. Park locations are as follows: Sunnymead Park: 12655 Perris Blvd (2 Baseball/Softball Fields) Morrison Park: 26667 Dracaea Ave (2 Baseball/Softball Fields) Shadow Mtn Park: 23239 Presidio Hills Dr (Multi-use: 1 Baseball/Softball Fields with Soccer use) Question Submission Deadline: September 25, 2024, 2:00pm All questions, technical, commercial, or contractual in nature shall be directed to the Q&A section on the e-Procurement System. No phone calls will be allowed. Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured from a surety company satisfactory to the City, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to the City of Moreno Valley to guarantee the Bidder will enter into a Contract with the City. The Contractor shall complete all preconstruction requirements, ordering of materials, and construction of the Project within the Contract Time of Sixty (60) Working Days for the Base Bid only, and up to Zero (0) Working Days for Base Bid plus all Additive Alternate Bids after the date of commencement specified in the Notice to Proceed to Fulfill Preconstruction Requirements issued by the City. Bid Value: $200,000 The City reserves the right, in its sole discretion, to: judge the Bidder's representations as stated in the Bid forms, including the Contractor's Statement, and any post-Bid information to determine whether or not Bidder is qualified to perform the Work; be the sole judge regarding the suitability of the products, services or supplies offered; to not purchase all items or the full quantity of each item listed in the Contract documents; accept or reject any or all Bids; modify, cancel or withdraw the Notice Inviting Bids; issue a new Notice Inviting Bids; suspend or abandon the Project; appoint evaluation committees to review bids; and seek the assistance of outside technical experts in Bid evaluation; waive deficiencies, informalities and minor irregularities in any Bid or in the bidding process; require a Bidder to provide a guarantee (or guarantees) of the Contract by a third party; and/or not issue a Notice to Proceed after execution of the Contract.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects