Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 4, 2024

December 23, 2024

October 31, 2025

To Be Determined

Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

To Be Determined, Castle Rock, CO

8

9

24

3

Subscribe to View Full Documents

Reference Number 0000362507 Delivery Point: Castle Pines Metropolitan District The District desires to select and successfully work with the selected CMAR Contractor (Contractor) on their New Water Tank Project during preconstruction and construction phases. The selected CMAR contractor will work with District staff, IMEG and additional stakeholders towards a successful completion of design and construction. It is the District's desire to engage the CMAR during the 30% - 60% design phase. Question Deadline 09/24/2024 at 2:00 PM MT Questions are submitted online No Questions are submitted online No Questions regarding the proposal submittal can be directed to the Castle Pines Metropolitan District Representative: Evan Person Capital Program Manager Castle Pines Metropolitan District 5880 Country Club Drive Castle Rock, CO 80109 Ph: 303-688-8330 eperson@castlepinesmetro.com Castle Pines Metro District (CPMD) serves water to approximately 2,000 accounts and 5,000 residents in The Village at Castle Pines (Village). Founded in 1980 as an exceptional residential community, the Village has always prioritized high standards and quality of service. In 2022, the District successfully completed a Long-Range Water Master Plan, which involved a comprehensive evaluation of the District's drinking water operations. This evaluation included an assessment of the existing facilities' condition and capacity. As a result, this project was identified to increase treated water storage capacity to address projected growth and increased water demand, adequate fire flow sizing, and improve the Districts water resiliency

50 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.