Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

October 24, 2024

December 5, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$1,000,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Gilbert, LA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe to View Full Documents

OJT Goal: Trainees Specbook: 2016 Pccp patching and related work Parish(es): Franklin Estimated Construction Cost: $500,000 to $1,000,000 LADOT - Franklin Parish PCCP Patching *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Furnish and construct surfacing for maintenance of traffic on driveways, pipe crossings, short-term traffic on raw embankrnent, slope corrections, or other disturbed roadway sections as directed and in accordance with the following requirements. This work consists offurnishing properly distributed asphalt material followed by a uniform application of aggregate for building a riding surface, improving the surface friction of a roadway, sealing cracks in the roadway, reducing the rate of oxidation of a surface mixture, or as an interlayer to delay or reduce the occurrence ofreflective cracking. Asphalt Surface Treatment (AST), sometimes referred to as chip seal, consists of a specified emulsion applied cold or polymer modified asphalt material applied hot, at the temperature range specified in Table 507-1 for cold applications or Table 507-2 for hot applications, respectively. The application rates of asphalt material and aggregates will vary with aggregate size and existing roadway conditions but, for bid purposes only, shall meet the requirements ofTable 507-1 or Table 507-2. The Project Engineer will review the actual application rates.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects