Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2024

July 7, 2025

November 30, 2025

13243 E 23rd Ave

Renovation

No Information to Display

$2,800,000.00

Public - State/Provincial

img_map_placeholder

13243 E 23rd Ave, Aurora, CO

29

19

3

Subscribe to View Full Documents

Date Email Written Questions Due 09/25/2024 - 3:00 PM (MT) Reference Number 0000362484 The project scope includes, but is not limited to the replacement and upgrades to mechanical & HVAC building systems at the CU Anschutz Perinatal Research Facility. (See AD for full scope) Scope of Services: The University of Colorado Anschutz Medical Campus is using a design/bid/build delivery approach to provide construction services for this project. This project is intended to be bid by interested and qualified general contractors and will include specialty subcontractors. A contractor's Agreement Design/Bid/Build (D/B/B) State Form SC-6.21 (State of Colorado, Office of the State Architect, State Building Program) will be utilized. This is a Prevailing Wage & Apprenticeship Training Public Project under requirements of passed Senate Bill 19-196. Project Description The project scope includes, but is not limited to the replacement and upgrades to mechanical & HVAC building systems at the CU Anschutz Perinatal Research Facility identified below: Replace rooftop air handling unit (PH-1) in its entirety. This will include replacement and reuse of existing hydronic components currently located in the boiler room section of unit and its related equipment. Replacement of the existing rooftop Bryan Steam Boiler with new. o This will include replacement of the boiler and modifications to the existing system to remove abandoned heat exchangers that were originally used to provide hydronic heating. The new system will be modified to serve only the steam needs of the entire building. Question Deadline 09/25/2024 at 3:00 PM MT Questions are submitted online Yes, Point of Contact/Clarification Name: Robert Holzwarth Agency: University of Colorado Anschutz Medical Campus (GFE) Phone: (720) 854-4664 Email: robert.holzwarth@cuanschutz.edu Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % Anticipated General Contractor Start (projected) 10/25/2024 Construction Start (on-site) 07/07/2025 Anticipated Construction Finish (Substantial Completion) 09/30/2025 Anticipated Final Acceptance (Close-out complete) 11/31/2025 Estimated Construction Cost: $2,500,000 - $2,800,000 (base bid) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects