Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 1, 2024

October 31, 2024

July 25, 2025

To Be Determined

Paving, Renovation, Site Work

No Information to Display

$850,000.00

Public - County

img_map_placeholder

To Be Determined, Colo, IA

31

27

2

3

Subscribe to View Full Documents

The Board of Education of the Colo-NESCO Community School District, will receive sealed bids for construction of a stadium consisting of a running track, bleacher ramp, parking lot, concession building and associated site work. Lump-sum bids will be received for: General Construction including Site work and Mechanical and Electrical Construction. Construction may begin following Owner receipt and approval of required Contracts, Bonds and Insurance. The Owner requires that Project be Substantially Complete by the 25th day of July, 2025. Bidders will be required to provide security deposit in the form of a Bid Bond executed by a corporation authorized to contract as surety in the State of Iowa, cashiers or certified check drawn on a solvent Iowa bank or a bank chartered under the laws of the United States, or certified share draft drawn on a credit unit in Iowa or chartered under the laws of the United States of a sum not less than 5 percent of the Base Price/Sum. The bid security should be made payable to the Colo-NESCO Community School District. The bid security must not contain any conditions either in the body or as an endorsement thereon. The bid security shall be forfeited to the District as damages in the event the successful bidder fails or refuses to enter into a contract within 10 days after the award of contract and post bond satisfactory to the District insuring the faithful fulfillment of the contract and the maintenance of said work, if required, pursuant to the provisions of this notice and the other contract documents. The successful Bidder will be required to furnish a Certificate of Insurance and Performance and Labor and Material Payment Bonds both in an amount equal to 100% of the Contract Price and in accordance with other requirements outlined in the Bid Documents. The Board of Education reserves the right to accept or reject any or all Bids, or any part thereof, and to waive informalities or irregularities allowed by law and to enter into such Contract or Contracts as may be deemed in the best interests of the Colo-NESCO Community School District.

80 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.