Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2024

January 6, 2025

January 6, 2025

94-465 Waipahu St

Site Work

No Information to Display

$100,000.00

Public - State/Provincial

img_map_placeholder

94-465 Waipahu St, Waipahu, HI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Waipahu Elementary School - Installation of new outdoor rated digital signage. New Equipment a. New outdoor rated sign shall be a single sided information sign, full color LED b. Sign display dimension shall be at least 8' wide x 4' height c. Display resolution shall be 288 * 288 d. Pixels pitch shall be P6 e. Total pixels shall be 73,728 px f. Contractor shall provide all necessary software to program and run the LED digital display. g. Equipment shall be Daktronics, Steward Signs or Whitebox II. Sign Mounting a. The new LED digital signage marquee will be mounted behind Portable One along the driveway. This system will be in color, easily programmable from a computer remotely, UV protected and on a timer to dim at night so as not to disturb the neighbors (the exact location to be determined at the mandatory pre-bid meeting). b. Structural supports to be designed and installed per sign manufacturer's recommendation to accommodate all local and building codes . Toning shall be done for any trenching work. Any soils from trenching work must remain and be disbursed on site. All existing conditions shall be properly restored. c. The contractor shall provide all necessary components for the complete installation; including but not limited to EMT conduits, wiring, circuit breakers, outlets, mounting brackets, hardware, fasteners, cabling, etc. III. Painting a. All exposed conduits shall be painted to match surrounding areas. b. Any damages caused by the contractor's work shall be repaired and touch up painted to the satisfaction of the project coordinator. IV. Electrical a. Electrical work shall be for both power and communication. b. The power for the sign shall be run from Portable One's electrical panel. The contractor shall verify power requirements of the sign before ordering. Wiring shall be sized per local electrical code and the NEC Handbook. Panel shall be properly labeled for the new display. c. Contractor shall include grounding rods and an approved surge protection device at the panel to protect new equipment from electrical power surges. d. Contractor shall provide two (2) Category-6 OSP cables and pull string from the sign's ethernet port to the communication hub in Building F IDF. Question Deadline 09/25/2024 Question submitter name will not be displayed. Answers Due Date: 09/27/2024

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.