Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 1, 2024

November 30, 2024

August 15, 2025

33300 Sherwood Dr

Site Work

No Information to Display

$5,000,000.00

Public - City

img_map_placeholder

33300 Sherwood Dr, Creighton, MO

39

20

2

2

Subscribe to View Full Documents

Enquiries can be sent via email to Chris Ball (cball@jbapc.com) and/or (Joey Crum) (jcrum@jbapc.com). Hourly wages, as set forth by the Department of Labor and Industrial Relations and the prevailing wage law, will be complied with on this project. Performance Bond and Material and Labor Payment Bond in amount of 100% of contract price shall be furnished by successful bidder. The Board reserves the right to accept or reject any or all bids and waives any informality in the bidding. The bidder acknowledges the right of the Owner to reject any or all bids and to waive any informality or irregularity in any bid received. In addition, the bidder recognizes the right of the Owner to reject a bid if the bidder failed to furnish any bid security, or to submit the data required by the bidding documents, or if the bid is in any way incomplete or irregular. Construction Schedule: Construction Schedule may start immediately and must be substantially complete by August 15, 2025. If the Contractor refuses, neglects, or fails to complete the Work within the time stated in the Contract, then the Contractor and the Contractor's surety, if any, shall be liable for and shall pay the Owner, not as penalty but as liquidated damages, the sum of four hundred dollars ($400.00) for each calendar day that the Contractor is in default after the time stipulated in the Contract for completing the Work of each Phase until the Work is Substantially Complete. The Owner may withhold from payments due the Contractor, such amounts as may be assessed as liquidated damages. Upon Substantial and Final Completion of the Work, the Owner may adjust the Contract Sum by the amount of the assessed liquidated damages Furnish and install all Wrestling Mats, Wall Pads, Indoor Tennis Net, Retractable Batting Cages, Sunshade, Portable Soccer Goal, Free Standing Bleachers, and Field Layout & Plugs as shown on the drawings and specified herein.

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.