Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 1, 2024

October 31, 2024

November 15, 2024

Multiple Locations

Demolition, Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

Multiple Locations, Minot, ND

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

The Project includes the following Work: 101/103 8th Ave SE Structure Demolition per L SUM, 112 8th Ave NW Structure Demolition per L SUM, and other associated items. Each bid must be accompanied by a bidder s bond in a sum equal to 5% of the full amount of the bid executed by the bidder as principal and by a surety, conditioned that if the principal s bid is accepted and a contract is awarded to the principal, the principal, within ten (10) days after the notice of the award, shall execute a contract in accordance with the terms of the bid and the bid bond, and any conditions of the City of Minot, as required by law. A countersignature of a bid bond is not required. If the City of Minot elects to award a contract to the lowest responsible bidder, and the lowest responsible bidder does not execute a contract within ten (10) days, the bidder s bond will be forfeited to the City of Minot, and the City of Minot may award the project to the next lowest responsible bidder. Each bidder must possess a valid North Dakota contractor s license for the full amount of their bid, as required by Section 43-07-07 of the North Dakota Century Code. Each bidder MUST enclose a copy of their Contractor s License or Certificate of Renewal, issued by the North Dakota Secretary of State, in their bid bond envelope, and each license must be valid and dated at least 10 days prior to the date set for bid opening, as required under Section 43-07-12 of the North Dakota Century Code. The City of Minot reserves the right to hold all Bids for a period of 30 days after the date of the bid opening, to reject any or all Bids and to rebid the project until a satisfactory bid is received, and to waive any informality or irregularity in any Bid. Est. Completion Date: Nov. 15, 2024

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.