Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2024

December 9, 2024

No Information to Display

12101 CO-61

Renovation

No Information to Display

$34,000,000.00

Public - State/Provincial

img_map_placeholder

12101 CO-61, Sterling, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe to View Full Documents

Reference Number 0000362299 The State of Colorado, Department of Corrections (CDOC), is soliciting the submittal of pre-qualifications from firms to replace the security systems for the Sterling Correctional Facility (SCF) Access Controls Electronic Security System Replacement - Phase 1 & 2 project. The pre-qualifications will be evaluated establishing a pre-qualified list of Security Electronics Contractors to bid the project. The project includes replacing the Door Control, Intercom, Paging, Access Control, Fiber Network, Woodwork, Countertops, Cooling Systems for Security Rooms, Uninterruptible Power Supply (UPS), and Transient Voltage Surge Suppression (TVSS) systems. The project includes the work shown on the Electronic Security (ES), Technology (TY) Security Drawings, the E series Electrical Drawings, and M Series Mechanical Drawings. The work also includes the work described in Specifications 28 70 00 through 28 70 95. The new system will require a Programmable Logic Controller (PLC) based control system in which all systems are to be integrated. Pre-Bid Meeting: Comments: Attendees shall complete, sign and submit a CDOC Consent to Search Authorization and Registration to Orrin Fryer (orrin.fryer@state.co.us) Question Deadline 09/26/ at 5:00 PM MT Fixed Limit of Construction is a range of $31,000,000 - $34,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.