Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 18, 2024

October 18, 2024

November 17, 2024

Multiple Locations

Renovation

No Information to Display

$250,000.00

Public - Federal

img_map_placeholder

Multiple Locations, Tuba City, AZ

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

This information is provided for the following project: 1. Funding: A single firm fixed-price contract will be made under this solicitation, as funds are presently available. The Government reserves the right to cancel this solicitation / Request for Proposal (RFP) before the closing date. 2. Proposal Acceptance Period/Date: The proposal acceptance period shall extend one hundred twenty (120) days past the RFP closing date. 3. RFP Deadline: September 18,2024 at 2:00PM MDT. The Contracting Officer expects prospective contractors to provide their proposal via e-mail to Krisanne.Dernagobie.edu 4. Questions and Answers: Any questions relating to this solicitation shall be submitted to the following individuals: Contract Specialist (CS), Contracting Officer (CO) and Contracting Officer's Representative (COR) no later than September 16, 2024, at 1:00 PM MDT. Any questions sent shall be submitted on the Questions and Answers Log attached to this RFP. 5. On-site Access: A list of personnel, with all pertinent information, to include, name, phone number, e-mail, and contractor name, shall be submitted to the CS, CO, and COR. A Site Visit for this requirement is scheduled to occur on September 10, 2024, at 9:00am MDT at the Arizona Navajo North Agency located at East Highway 160 & Warrior, Tuba City, AZ. Please email the CS of your intent to participate in the site visit meeting NLT one day prior to the site visit. 6. Wage Determination: Wages for all contractors and subcontractors must comply with Davis Bacon Wage Determinations. The current determination is # AZ20240043; See attachment Wage Determination. Be advised the determination that is current at the time of the Contract awarded is the determination that will apply for the project. Current determinations are always available at: https://sam.gov/. 7.Notice to Proceed (NTP): A NTP will be issued after the kickoff/Pre-Construction meeting, Receipt of Bonding and Valid Background Screening. 8.Period of Performance: Thirty (30) Calendar Days from the notice to proceed (NTP) 9.In accordance with FAR Part 63.204 -Disclosure of the Magnitude of Construction Projects, the estimated price range is between $100,000.00 - $250,000.00. 10.Special attention is called to FAR Clause 52.236-7, Permits and Responsibilities and FAR Clause 52.229-3, Federal, State, and Local Taxes. Offerors are responsible for contacting the tax authorities and tribe or tribal organization involved with regard to any requirements regarding state taxes, tribal taxes, royalties and/or other applicable tribal laws or ordinances. Any costs associated with this section shall be included in the contractor's firm fixed price proposal. Contractor is responsible for contacting the appropriate TERO and/or appropriate Tribal Taxation Authority office for coordination and approvals. Please refer to Section H and the applicable clauses for additional information about these requirements. 11. A Contract is being competed using the Lowest Price Technically Acceptable source selection process described in Section L & M. In accordance with section M, the total price will be evaluated upon reasonableness and completeness. Note, only the lowest price responsive offer will be evaluated for technical acceptability. If the lowest price responsive offer is technically acceptable; award will be made to that offeror and no other offeror will be reviewed for technical acceptability. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.