Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 25, 2024

April 1, 2025

September 29, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

Multiple Locations, Lincoln Park, MI

106

7

2

4

Subscribe to View Full Documents

Reference Number 0000362102 The City of Lincoln Park is accepting sealed bids from Contractors. The proposed project consists of water main replacement of McClain, Mill, Cleveland, Lincoln, Garfield, Philomene, Cleophus Avenues from West of Howard Street to Fort Park Blvd., and Fort Park Blvd. from Champaign to Cleophus Ave. The water main replacement work will consist of approximately 13,100 feet of 8-inch HDPE Direction Drill, 1,750 feet of 8-inch HDPE Pipe Bursting and 2761 feet of 8-inch D.I Water Main Open Cut and including thirty eight (38) new Fire Hydrants, seventeen (17) of 8-inch Gate Valve & Wells, sixteen (16) of 8-inch Gate Valve and D-Boxes, one (1) 8-inch tapping sleeve and well, (587) Water Service Replacement from the new water main to the curb stop (city side only) and (164) Lead Water Service Replacement from the water main to the meter 18-inch inside the buildings. The work involves removal and replacement sections of roads, sidewalks, and driveways to complete the work. The anticipated start date weather permitting no later than April 1st, 2025, and substantially completed by September 1st, 2025, with restoration and final completion by September 29, 2025. Bidders must deposit, with their bid, surety in the form of a certified check, bank draft, or bid bond, in the sum of five percent (5%) of the amount of the proposal. **The OWNER reserves the right to waive any information or to reject any and/or all bids. Bidders may not withdraw their bid within 90 days after the date of bid opened. All questions relating to the meaning or intent of the Contract Documents shall be submitted to the ENGINEER in writing. Replies, if any, may be issued if ENGINEER decides it to be in the interest of the project, by addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. ENGINEER reserves the right not to answer questions received less than 10 days prior to the date for opening of bids.

57 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects