Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2024

October 28, 2024

October 31, 2025

To Be Determined

Site Work

No Information to Display

$1,000,000.00

Public - City

img_map_placeholder

To Be Determined, Benton City, WA

6

3

4

2

Subscribe to View Full Documents

Scope of Work - Reservoir Description: The Reservoir #2 is equipped with a water tower that features a cylindrical base with a diameter of 40 feet and a height of 120 feet. The structure supports a tank thatadds an additional 30 feet to the height, resulting in a total structure height of 155 feet. At the base of the tower, an 8-foot by 8-foot access provides entry and exit for maintenance personnel. Inside thetower, maintenance is facilitated by a series of platforms and ladders spaced every 20 feet, extending up to the interior height of 120 feet. The leak is located at the bottom of the tank, just above the walkway. Additionally, a roof hatch at the top of the tank provides access to the tanks interior 5% Bid Bond required: YES Bonded & Licensed Contractor: YES Performance & Payment Bond: YES Washington State Prevailing Wage Rates required: YES Time of completion: Contractor shall complete work by October 31, 2025, and within five (5) consecutive working days starting from the commencement of work. The Owner reserves the right to reject any or all bids, accept any bid, or waive minor informalities.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects