Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 7, 2024

December 6, 2024

June 6, 2026

1625 Av. Galt

Renovation

No Information to Display

$3,000,000.00

Public - City

img_map_placeholder

1625 Av. Galt, Montreal, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference number: 20016850 Deadline for receipt of complaints: 2024-09-23 Post-Disaster Rehabilitation and Complete Refurbishment of Building and Electromechanical Systems at Habitations Angers, 1625 rue Galt, South-West Borough, Montréal, Québec, H4E 4J7. The project consists of performing all work in accordance with the contract documents. Without limitation, the scope of work includes: The complete reconstruction and refurbishment of 102 units, common areas and a community hall following a disaster. All interior stripping and decontamination work has been completed, with the exception of the ground floor vestibule. ARCHITECTURE - Complete rebuilding of interior living and common areas: partitions, floors, ceilings, equipment, built-in furniture, etc; - Replacement of the roof; - Replacement of exterior doors and windows; - Partial rehabilitation of the exterior envelope, including replacement of parapets and staining of existing masonry; - Modernization of marquee and main entrance; - Refurbishment of balconies and new external railings; STRUCTURE - Repairs and corrections to existing structure. - Reinforcement and addition of bracing. - Reinforcement of existing block walls; - Floor repairs on upper floors, including sealing of non-required openings. - New floor openings. - Complete rebuilding of basement slab. - Poured concrete structure for new wolf jumps; - Related work in coordination with other disciplines; ELECTROMECHANICAL - Dismantling and demolition of all electromechanical components and systems; - Complete replacement of all ventilation, heating, plumbing, electrical and telecommunications systems and components throughout the building; - Upgraded ventilation systems in common areas, apartments, exits, garage, basement mechanical rooms and waste management rooms; - New rooftop ventilation unit; - New electrical entrance and related work; - New security equipment, access control and video surveillance; - New control and regulation systems; FIRE PROTECTION - Upgrade of entire fire protection system, new sprinkler system, fire alarm, siamese pipes, sprinklers, etc... ELEVATOR - Refurbishment and modernization of elevators; CIVIL & LANDSCAPING - Excavation/backfilling and levelling required for landscaping work; - Replacement of main supply conduits; - Separation of storm and sanitary water; - Water retention system; - Exterior landscaping; - Drainage upgrades and landscaping restoration; - French drain. DECONTAMINATION - Demolition of ground-floor vestibule in asbestos condition. Soot removal on some existing components. The work will be carried out in a 7-storey building with a basement, comprising a total of 102 housing units and communal areas and a community room on the ground floor, dedicated to the elderly. The typology is divided into 81 one-bedroom units and 21 two-bedroom units. Seven 1-bedroom units are adapted for people with reduced mobility. The building has a steel structure with a poured concrete foundation. The floor of the upper storeys consists of a 64 mm concrete slab with a metal lattice supported by open-work "Hambro" steel joists. The ground floor slab is made of concrete. The external envelope consists mainly of textured concrete blocks, with metal parapet cladding around the perimeter of the roof. The roof is covered with an elastomeric membrane. The work must be carried out within a maximum of 375 working days from the date confirmed for the start of the work in the letter of commitment.

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects