Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

October 28, 2024

December 28, 2025

901 NW 178th Ave

Site Work

No Information to Display

$100,000.00

Public - City

img_map_placeholder

901 NW 178th Ave, Pembroke Pines, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe to View Full Documents

The City of Miramar is soliciting bids from qualified contractors to furnish all material, equipment, labor, and any incidentals to replace 1" and 1 1/2 "service pipeline in the Silver Lakes Community in the City of Miramar. The City reserves the right to reject any or all bids/proposals, to waive any informality in a bid/proposal and/or in the bidding/selection process, and to make awards, if awarded, to the lowest responsive, responsible bidder/offeror as deemed in the best interest of the City. All questions must be submitted in writing to the Citys Procurement Department, 2200 Civic Center Place, Miramar, Florida 33025, by email to jdchong@miramarfl.gov no later than September 19th, 2024, at 5:00 P.M. The City of Miramar is soliciting bids from qualified contractors to furnish all material, equipment, labor, and any incidentals to replace 1" and 1 1/2 "service pipeline in the Silver Lakes Community in the City of Miramar. The scope of services includes the following: o Pipe Replacement (1" dia) - This item includes pavement removal, excavation and removal of existing water lateral and replace with new 1" diameter water service pipeline (polypipe blue) including all fittings from the watermain to the meter box. Unit price must include restoration of pavement base materials which is flushed to existing pavement. o Pipe Replacement (1-1/2" dia) - This item includes pavement removal, excavation and removal of existing water lateral and replace with new 1-1/2" diameter water service pipeline (polypipe blue) including all fittings from the watermain to the meter box. Unit price must include restoration of pavement base materials which is flushed to existing pavement. o Removal, disposal, furnish and install new 4-inch-thick concrete sidewalk. o Removal, disposal, furnish and install new 6-inch-thick concrete sidewalk. o Removal, furnish and install FDOT Type F curb and gutter. o Removal, furnish and install valley curb and gutter (FDOT Drop Curb) o Removal, furnish and install FDOT Type D curb. o Asphalt Pavement Restoration - Furnish all materials and equipment to install Type S-3 asphaltic concrete leveling course using not more than 25% by weight of total aggregates of reclaimed asphalt. This item also includes pavement preparation, maintenance of traffic preparation, routing, and setup. o Sod/Swale Restoration - Furnish all materials, labor, and equipment to lay St. Augustine Floratam, including site preparation, and all other appurtenances. o Hydro Vactor Truck Rental.

32 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects