Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 4, 2024
November 4, 2024
August 1, 2025
Multiple Locations
Renovation
No Information to Display
$151,461.00
Public - County
Multiple Locations, Cleveland, OH
Mechanical Upgrades at Mount Auburn Apartments The construction estimate range for this project is between $109,679.00 - $151,461.00 Questions will be received in writing no later than 10:00 AM local time on September 18, 2024, via email at cousotrigoy@cmha.net Responses to all questions will be posted as an addendum and posted to CMHA's website at online. Each bid must be accompanied by a properly executed Bid Bond, Certified Check, or Cashier's Check on a solvent bank, made payable to the Cuyahoga Metropolitan Housing Authority in an amount which shall not be less than 10% of the total amount of the bid. CMHA reserves the right to reject any and all bids received and waive any informality in bids received whenever such rejection or waiver is in the best interest of CMHA. Bids shall be firm and cannot be withdrawn for a period of 120 calendar days, subsequent to the opening of bids, without the consent of CMHA. CMHA is a Political Subdivision of the State of Ohio and is exempt from all taxes. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PROJECT LOCATION Union Square Apartments, 3495 E.98th Street, Cleveland, Ohio44104. The project consists of removal and replacement of a new Makeup Air unit on the top floor of the building. Removal and replacement of the lobby A/C unit, circulating pumps, and split system for the elevator machine room. The project includes all related ductwork, duct smoke detectors, thermostats, and related hardware. Also, install diffusers and connect the existing ductwork to the areas shown serving the lobby. b. The work includes all permits, labor, materials, and equipment for the work per attached scope of work. See Osborn Engineering Project Manual and Engineered Drawings for all work related to this project Replacement of the existing ~ 7200 CFM gas fired make up air unit located in the penthouse. Replace the existing 4-ton A/C unit serving the lobby. Replacement of the existing 5-ton A/C split system serving the elevator machine room. Replacement of the 200-gallon domestic hot water storage tank located in the penthouse.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Cleveland, OH
Bid Date: Oct 21 2024
Cleveland, OH
Bid Date: Sep 20 2024
Cleveland, OH
Bid Date: Sep 17 2024
Cleveland, OH
Bid Date: Oct 23 2024
Cleveland, OH
Bid Date: Oct 23 2024
Cleveland, OH
Bid Date: Sep 18 2024
Cleveland, OH
Bid Date: Sep 12 2024
Cleveland, OH
Bid Date: Oct 03 2024
Cleveland, OH
Bid Date: Oct 10 2024
Cleveland, OH
Bid Date: Oct 28 2024
Cleveland, OH
Bid Date: Oct 04 2024
Cleveland, OH
Bid Date: Sep 24 2024
Cleveland, OH
Bid Date: Jul 23 2024
Cleveland, OH
Bid Date: Aug 12 2024
Cleveland, OH
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
