Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2024

November 1, 2024

December 1, 2024

86181 E Avenida de Aviacion

Site Work

No Information to Display

$290,000.00

Public - County

img_map_placeholder

86181 E Avenida de Aviacion, San Manuel, AZ

34

9

2

2

Subscribe to View Full Documents

Pinal County is seeking a qualified contractor to replace security fencing along the San Manuel Airport property. PINAL COUNTY PROJECT NO. 207026R0Q Question Deadline 09/25/2024 at 5:00 PM MT Online Portal Online Portal Questions concerning this project must be submitted through the project site in Bonfire Description: Work items on this project include: a. Removal of exiting fence; clearing and grubbing b. Installation of new security fence and double swing gate; application of pre-emergent herbicide The proposed work is located at the San Manuel Ray Blair Airport at 86181 E. Avendia de Aviacion, San Manuel, AZ 85631, ("Airport"). The project scope consists of the following tasks; installation of a new security fence that encloses a greater portion of the available area within the existing property boundary and prevents wildlife from entering the Airport. The new fence alignment will follow the existing unpaved road that provides public access across the Airport's property and along the property line. The area along the fence line that follows this property line will be cleared and grubbed to allow vehicular access. The existing fence located in the project area will be removed. The Contractor shall furnish all labor, materials and equipment to completely construct the proposed project in strict conformity and in accordance with the design plans and specifications prepared for Pinal by Dibble. The Work is to be accomplished in a good and workmanlike and substantial manner and to the satisfaction of both the Pinal Airport Director and the Engineer of Record. This work shall be accomplished in accordance with the standards of the Industry in use at the time of the signing of this contract. Unless excepted by the Engineer, work on this project shall be started within ten (10) calendar days from the issuance date of the written "Notice to Proceed" and be completed within thirty (30) calendar days from the Notice to Proceed date

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.