Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 21, 2024

No Information to Display

98 Rochester St

Renovation

No Information to Display

$100,000.00

Public - Federal

img_map_placeholder

98 Rochester St, Upton, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Brookhaven Science Associates (BSA) is issuing a Request for Quote (RFQ) for floor leveling and epoxy coating per the BNL provided statement of work (SOW). BSA invites you to participate in accorance with the RFQ letter and all supporting attachments. This requirement has been posted on the SAM.gov website under solicitation number RFQ-451845. The proposal due date is September 19, at 5:00 p.m. EDT. Any questions concerning this RFQ must be addressed via email to the attention of Ben Furlow (bfurlow@bnl.gov). The Offeror shall provide all necessary labor, materials, and equipment to provide the needed services detailed in the statement of work and all other attachments as outlined in Enclosure 1, Draft Contract 451845 The Contractor shall be responsible for the following: 1. Prepare the existing concrete floor to be leveled by scarifying the entire area as shown in BSA drawing SK-PD-CDI-2000. The Contractor shall mitigate dust generation using a HEPA vacuum and portable clean tent (provided by BSA). 2. The Contractor shall measure the floor elevation with a precision water level at points on a 6-inch grid pattern. At each point on the grid the Contractor shall place pins cut to the exact height that the levelled surface will be at that point. 3. Laticrete levelling grout (or equivalent - subject to review and approval by BSA) shall be mixed and poured to the top of the pins which remain in the grout. 4. Once the grout is cured the entire surface shall be prepared/scarified to prep for the epoxy coat. The Contractor shall mitigate dust generation using a HEPA vacuum and portable clean tent (provided by BSA). 5. Upon completion of preparation of the levelled floor surface, the contractor shall apply two coats of primer, then a 2mm epoxy coating layer of Stonlux S1 epoxy flooring system. 6. Contractor shall bring their own tools to the site to perform the measuring of floor elevation, shot-blasting, planetary grinding, mixing, pumping and spreading of levelling grout, application of primer and epoxy coating. 7. Contractor shall clean up all waste materials at the end of each day and dispose in a trash in dumpster provided by contractor. 8. Contractor shall be responsible for hauling away and disposal of all waste materials. 9. The Contractor shall warranty the levelled floor materials and workmanship for one year from the completion of the contract. 10. The Contractor shall provide a Job Hazard Analysis (JHA) using the provided template for BSA review 1 week after award of contract. Contractor workers shall complete required training for working at NSLS-II per the JHA

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.