Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 8, 2024

December 2, 2024

December 4, 2026

Multiple Locations

Outdoor Lighting, Paving, Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

Multiple Locations, Olathe, KS

1051

14

4

Subscribe to View Full Documents

Question Deadline 10/03/2024 at 5:00 PM CT Completed forms and questions may be directed to: City of Olathe Erin Sease, Accounts Payable Clerk PO Box 768, Olathe, KS 66051 ejsease@olatheks.org (913) 971-8610 This project includes construction of roadway, bridge, traffic, and storm sewer improvements along 119th Street from Lone Elm Road to Sunset Drive. Roadway widening is included at the 119th Street and Lone Elm Road and the 119th Street and Iowa Street intersections, as well as storm sewer improvements, traffic signals, streetlights, sidewalks and ADA curb ramps, a commercial driveway, mill and overlay, fiber interconnect, and pavement marking and signing. At 119th Street and Woodland Road, pavement widening to both roadways and new medians will be constructed. Improvements also include storm sewer, traffic signals, streetlights, sidewalks and ADA curb ramps, residential driveways, landscape irrigation system, underdrains, retaining walls, mill and overlay, fiber interconnect, and pavement marking and signing. New roadway and bridges on 119th Street between Woodland Road and Northgate Street will include storm sewer, streetlights, sidewalks, ADA curb ramps, fiber interconnect, and pavement marking and signing. Bridge construction to include two new bridges, each 857' in length constructed with precast prestressed NU-shaped girders on concrete column piers supported by drilled shafts, and pile cap integral end bents. The east end bent is located immediately behind and MSE retaining wall. The bridges will span Mill Creek, Mill Creek Tributary M, the Gary L. Haller Trail, two swaths of BNSF RR R.O.W. and two existing active BNSF RR tracks. 119th Street and Northgate Street includes a new dual-lane roundabout with storm sewer, streetlights, sidewalks, ADA curb ramps, landscape irrigation system, underdrains, retaining walls, mill and overlay, fiber interconnect, and pavement marking and signing. Nelson Road will be realigned and constructed with a single-lane roundabout with storm sewer, streetlights, sidewalks, ADA curb ramps, and pavement marking and signing. The project also includes construction of approximately 800 feet of 30-inch water main between Woodland Road and Northgate Street in existing road right-of-way and existing water main easement. The new water main relocates the existing 30-inch transmission water main which serves the City of Olathe and is being relocated due to road and bridge construction through the area, connecting 119th Street from Woodland Road to Northgate Street. The project includes tie-ins to the existing water main and installation of butterfly valves at each tie-in A satisfactory bid bond executed by the bidder or an acceptable surety, in an amount equal to five percent (5%) of the total bid for work shall be submitted with each proposal. Bids may be held by the City of Olathe, Kansas, for a period not to exceed sixty (60) days from the date of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding the contract Anticipated Notice to Proceed is approximately December 2nd, 2024, contingent upon status of C&M Agreement with BNSF. The City of Olathe, Kansas, reserves the right to reject any or all bids or to waive any informality in the bidding

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.