Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 25, 2024

October 21, 2024

May 29, 2025

1701 Spruce Dr

Site Work

No Information to Display

$800,000.00

Public - State/Provincial

img_map_placeholder

1701 Spruce Dr, Rolla, MO

38

22

2

5

Subscribe to View Full Documents

The project will include furnishing all labor, materials, and equipment required for the installation of heating and chilled water piping to connect Parker and Norwood Hall's to the campus geothermal loop. The Project shall consist of removing existing tunnel piping and installing heating and chilled water piping to connect Parker and Norwood Hall to the campus loop system. Supporting asbestos abatement, concrete, excavation, electrical, and site restoration work are also included. The Contractor shall have as a goal, subcontracting with Minority Business Enterprise (MBE) of ten percent (10%), with Women Business Enterprise (WBE), Disadvantage Business Enterprise (DBE), and/or Veteran Owned Business Enterprise, of ten percent(10%), with Service-Disable Veteran Owned Business (SDVE) of three percent (3%) of awarded contract price for work to be performed. The Contractor shall have as a goal, subcontracting with Minority Business Enterprise (MBE) of ten percent (10%), with Women Business Enterprise (WBE), Disadvantage Business Enterprise (DBE), and/or Veteran Owned Business Enterprise, of ten percent(10%), with Service-Disable Veteran Owned Business (SDVE) of three percent (3%) of awarded contract price for work to be performed. Questions regarding the scope of work and commercial conditions should be directed to Jack Mentink, PE, Project Manager at (573) 341-6212 or jackmentink@mst.edu. Information regarding bid results will be available the day following the bid opening at online. The Owner reserves the right to waive informalities in bids and to reject any and all bids. Construction Estimate Base Bid: $700,000-$800,000 Alternate No. 1 Estimate: $150,000-$200,000 Document info : A download is available for a (non-refundable) purchase. Neither owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda (if any) obtained from sources other than the issuing office. All Contract Documents must be obtained by the Bidder from ADS to be an Eligible Bidder. Download this entire project for $50.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.