Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 1, 2024

October 30, 2024

September 30, 2026

To Be Determined

Site Work

No Information to Display

$430,000.00

Public - City

img_map_placeholder

To Be Determined, Montverde, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe to View Full Documents

Project Title: Montverde Wastewater Treatment Plant Proposals must be submitted using the Proposal Forms provided. Proposals must be submitted to the recipients listed in the Responsible Parties section. Addendums to this RFP package will be issued as needed by Woodard & Curran and shall be acknowledged with the final pricing by the SUPPLIER on or before the Proposal due date. Project Introduction : The town of Montverde, Florida is located in Lake County west of Orlando on scenic rolling hills on the western shore of Lake Apopka. The town predominantly consists of residential properties and maintains a small-town rural character and an easy-going lifestyle. In the center of town is a small downtown commercial area adjacent to Montverde Academy which is a 130-acre private college preparatory PK-12 school that is well known nationally for its athletics and fine arts programs. Currently Montverde's wastewater is collected and treated using septic systems. The town recently received ARPA, DEP CSLFRF, and SAHFI funding to construct a collection system and central wastewater treatment plant within the town's boundary limits, to connect properties to the new collection system, and to decommission the existing septic systems. The purpose of this RFP is to solicit competitive proposals for a Design-Build Contract to design, supply, install, and commission a package wastewater treatment plant (WWTP) for Montverde (OWNER). There are also two (2) Alternates pertaining to stricter effluent quality permit levels which may be enforced by DEP in the near future. Woodard & Curran, Inc. (ENGINEER) has been hired to represent Montverde and is serving as the OWNER's Advisor on the project. A goal offive percent ofthe Contract Price is established for Minority Business Enterprise (MBE) participation in the Work, and a goal offive percent ofthe Contract Price is established for Women's Business Enterprise (WBE) participation in the Work. Question Deadline 09/17/2024 at 5:00 PM ET RFIs Due questions or concerns about meeting these requirements, they can use the RFI tools to address their questions. Details of the design requirements for the equipment can be found in Appendix A

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects