Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

November 18, 2024

March 24, 2025

Multiple Locations

New Construction, Site Work

No Information to Display

$1,600,000.00

Public - City

img_map_placeholder

Multiple Locations, Airway Heights, WA

42

11

4

3

Subscribe to View Full Documents

The Project Generally Consists of the Following Items: o Temporary Sewer Bypass for the Duration of Construction. o Installation of a 50-foot, 21-inch Sewer Line and a 48-inch New Manhole Connecting the Lift Station to the Existing Sanitary Sewer Collection System. o Construction of the Lift Station Wet Well and Valve Vault and Drop Manhole Connection. o Installation of New Lift Station Pumps and Controls. o Installation of a 6-inch, Approximately 3000-foot New Force Main and Connection to the Existing 12-inch Force Mains. o Site Grading and Improvements, Including but Not Limited to Fence Installation, Water, and the Construction of a Concrete Pad for Control Panels and Emergency Generator Placement. o Site Electrical Improvements, Including Lighting and Security. o Installation of an Emergency Generator. o Removal and Reinstallation of Fencing and Restoration of Disturbed Areas. o Auger Boring Under the Spokane County Railroad Spur and Pipe Casing Installation. All Work Will Be Performed in Accordance With the Attached Contract Plans, These Contract Provisions, and the Standard Specifications. Ninety (90) Working Days Will Be Allowed to Complete the Work. Each Proposal Must Be Submitted on the Prescribed Form and Accompanied by Cash, a Certified Check, Cashier's Check, or Bid Bond, Payable to the City of Airway Heights, in an Amount Not Less Than Five Percent (5%) of the Amount Bid. The Successful Bidder Will Be Required to Furnish a Performance Bond and Payment Bond, Each in the Full Amount of the Contract Price. Neither Owner Nor Engineer Will Be Responsible for Full or Partial Sets of Bidding Documents, Including Addenda if Any, Obtained From Sources Other Than the Issuing Office. For Information Regarding the Proposed Work, Contact Jirayr Aghazarian of Century West Engineering (509) 415-9417 or (509) 838-3810 Ext 209, Email: Jaghazarian@centurywest.com. Any Questions Regarding This Plan Room, Shall Be Directed to Plan Room Administration at 509-747-2964 or Planroom@abadanplancenter.com. Partial Sets of Bidding Documents Will Not Be Available From the Issuing Office. Neither the State of Washington Nor Any of Its Departments or Employees Are, or Shall Be, a Party to Any Contract or Any Subcontractor Resulting From This Solicitation for Bids. Award of the Construction Contract is Contingent Upon Approval by the Funding Agency. All Contractors Submitting a Bid for This Project Must Be Licensed in the State of Washington. The Successful Bidder Will Be Required to Conform to the Wage Requirements Prescribed by the Federal Davis-bacon and Relate Acts Which Requires That All Laborers and Mechanics Employed by Contractors and Subcontractors Performing on Contracts Funded in Whole or in Part by Srf Appropriations in Excess of $2000 Pay Their Laborers and Mechanics Not Less Than the Prevailing Wage Rates and Fringe Benefits, and Determined by the Secretary of Labor, for Corresponding Classes of Laborers and Mechanics Employed on Similar Projects in the Area. All Work Performed Will Be Subject to the Higher of Federal or State Prevailing Wage Rates. The City Shall Have the Right to Reject Any or All Bids Not Accompanied by Bid Security or Data Required by the Bidding Documents or a Bid in Any Way Incomplete or Irregular. The City of Airway Heights is an Equal Opportunity and Affirmative Action Employer. Certified Disadvantaged Business Enterprise Firms Are Encouraged to Submit Bids. Estimate Low:$1,400,000 Estimate High:$1,600,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All other terms and conditions of the bid documents remain unchanged. For any questions regarding this addendum, please contact Jirayr Aghazarian at (509) 415-9417 or JAghazarian@centurywest.com. Temporary sewer bypass for the duration of construction. Installation of a 50-foot, 21-inch sewer line and a 48-inch new manhole connecting the lift station to the existing sanitary sewer collection system. Construction of the lift station wet well and valve vault and drop manhole connection. Installation of new lift station pumps and controls. Installation of a 6-inch, approximately 3000-foot new force main and connection to the existing 12-inch force mains. Site grading and improvements, including but not limited to fence installation, water, and the construction of a concrete pad for control panels and emergency generator placement. Site electrical improvements, including lighting and security. Installation of an emergency generator. Removal and reinstallation of fencing and restoration of disturbed areas. Auger boring under the Spokane County Railroad spur and pipe casing installation.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects