Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

December 6, 2024

No Information to Display

300 Frey St

Renovation

No Information to Display

$1,200,000.00

Public - City

img_map_placeholder

300 Frey St, Coalgate, OK

Our team is requesting plans for this project.

Subscribe to View Full Documents

Work Will Also Include Selective Demolition And Preparation For Concrete Sidewalk, Sodding, Concrete Floor Leveling, Metal Stud And Wood Stud Framed Walls, Eifs System, Gypsum Board, Gypsum Ceilings, Hollow Metal Doors And Frames, Pre-hung Wood Doors, Door Hardware, Aluminum Window Replacement, New Finishes Throughout, Ceramic Tile, Carpet, Luxury Vinyl Tile, Sealed Concrete, Painting, Fi Re Alarm, Hvac Replacement, Plumbing, Electrical And Lighting Systems Rework, Complete And Ready For Use. C. Location: Coalgate Public Schools 300 Frey Street, Coalgate, Ok 74538 1.6 Bid Date, Time And Place A. Bid Date, Time And Place Will Be Issued In An Addendum At A Later Date. 1.7 To: Potential Bidders. B. Bidders For Work Packages May Be Required To Submit A Contractor's Qualifi Cation Statement As Specifi Ed In Document 00 4513 - Bidder's Qualifi Cations. Bidders For Work Packages Should Be Prepared To Submit Contractor's Qualifi Cation Statement To Construction Manager. Utilize Aia Form A305 - Contractor's Qualifi Cation Statement. C. Bid Documents For Stipulated Sum Separate Prime Contracts For Specified Work Packages May Be Obtained From The Office Of The Construction Manager. Contact The Office Of The Construction Manager To Reserve Bidding Documents. Bidders May Obtain Maximum Two (2) Sets Of Bidding Documents. 1. Bidders Are Responsible For Arranging Pick-up Or Shipment Of Bidding Documents With The Construction Manager. Shipping Cost Determined By Construction Manager. E. Bidders May View The Bid Documents At The Office Of The Owner Or At Local Plan Rooms. F. Bidders Will Be Required To Provide Bid Security In The Form Of A Bid Bond In The Amount Of Fi Ve (5) Percent Of The Bid Amount. 1. Bidders Are Required To Submit Sample Copies Of Each Required Bond, Including Bid Bond, No Less Than Seven (7) Days Prior To Scheduled Bid Opening. G. Submit Your Offer On The Bid Form Provided In The Project Manual. H. Your Bid Is Required To Be Submitted Under A Condition Of Irrevocability For A Period Of 30 Days After Submission. I. The Owner Reserves The Right To Accept Or Reject Any Or All Offers. 1.8 Reproduction Vendor

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects