Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

October 24, 2024

January 22, 2025

S Shelby St

Paving, Site Work

No Information to Display

$200,000.00

Public - County

img_map_placeholder

S Shelby St, Louisville, KY

5

18

Subscribe to View Full Documents

This Contract provides for the installation of approximately 191 linear feet of 8-inch sanitary sewer pipe six (6) property service connections and associated private plumbing 2 sanitary sewer manholes pavement and ground restoration erosion prevention and sediment control traffic control and other appurtenant work. The project is generally located along South Shelby Street in the Merriwether neighborhood in western Jefferson County. The principal features of the Work to be performed under this Contract include, but are not limited to the following: 1. Installation of approximately 191 linear feet of 8-inch sanitary sewer pipe 2. Installation of six (6) property service connections and associated private plumbing 3. Installation of 2 sanitary sewer manholes 4. Pavement and ground restoration 5. Erosion prevention and sediment control 6. Traffic control 7. Other appurtenant work The Engineer's Construction Cost Estimate for this project is between $ 150,000.00 and $ 200,000.00 . *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 09/13/2024 The Project Manager for this Invitation to Bid is Jacob L. Mathis, P.E. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD's designated web portal. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD's Chief Engineer, David Johnson, P.E. If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. a. Bid Bond in the amount of 7.5% of the Total Bid, and a b. Performance Bond in the penal sum not less than one hundred percent (100%) of the Contract Price, and a c. Payment Bond in the penal sum not less than one hundred percent (100%) of the Contract Price, and a d. Maintenance Bond in the penal sum as described on Contractor's Insurance and Bonding attachment of the Information to Bidders

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.