Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

December 20, 2024

25 Leary Dr

Renovation

No Information to Display

$45,000.00

Public - City

img_map_placeholder

25 Leary Dr, Holyoke, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe to View Full Documents

Flooring and Subfloor removal and replacement in 25 Leary Ave. Furnish all labor, materials, tools, and equipment to demo flooring and subfloor in 25 Leary Ave. Subfloor replacement throughout unit as well as install prefinished hardwood flooring, install new stair treads and new painted wood base installed throughout units first and second floors. The contractor is responsible for all associated permit fees. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. All questions pertaining this QSP shall be addressed to Eric Jimmo, Modernization Coordinator, in writing by email, ejimmo@holyokehousing.org and Amie Chrzanowski, Purchasing Assistant, achrzanowski@holyokehousing.org Questions due by September 13 , 2024 by 1:00 pm The Work of the Contract consists of: - Removal and disposal of 700 Sqft of hardwood flooring and subfloor down to bare floor joist in 3 2nd floor bedrooms and 2nd floor hallway landing, also included in the scope for subfloor removal is the 1st floor living room. - Removal and disposal of 150 Sqft of sheet good flooring and existing underlayment in kitchen and bathroom. - Furnish and install new 3/4 '' Tongue and groove subfloor sheathing. Subfloor installation requires the use of approved sub floor adhesive. - Furnish and install new 1/4 '' underlayment in 3 bedrooms, hallway landing, living room, kitchen & bathroom - Furnish and install sufficient quantity of pre-finished 3/4 ''X 2 1/4 '' clear maple or oak random Length plank to be directly fastened to new subfloor to finish all areas of the unit scheduled for new hardwood flooring. 3 bedrooms , hallway landing, living room. - Furnish and install sufficient Quantity of Sheet Vinyl Flooring to kitchen and bathroom of the unit. Sheet vinyl Flooring to be IVC Floors-FLEXITEC- Previa 544 or Equal. - HHA will remove all items required to be moved prior to work starting. - Furnish and install new wood baseboard throughout entire unit. Base board to be paint grade 1x4 pine . New baseboard to receive 1 coat primer and 2 coats finish paint. Paint to be supplied by HHA. Adjust and cut down all doors to facilitate a 3/4 '' gap at bottom of door. B. Execution of Work: Work to be performed in timely and workmanlike fashion throughout the project. Site must be cleaned up daily with access needed for overnight

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.