Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

June 30, 2025

40 S Porter St

Site Work

No Information to Display

$89,689.00

Public - City

img_map_placeholder

40 S Porter St, Haverhill, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Project Installation of Two Pre-purchased Vulcan Stair Screens at the Wastewater Treatment Plant. Question Deadline 09/13/2024 at 4:00 PM ET Questions concerning this bid must be submitted in writing by email to Steven Bucuzzo at purchasing@cityofhaverhill.com and Written responses may be emailed to all bidders on record having obtained the IFB from purchasing@cityofhaverhill.com. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The work will generally consist of the following: 1. The City of Haverhill Purchased two (2) Vulcan Stair Screen (Model No: ESR 28/1662/6). The Contractor is responsible for demolition and removal of the existing stair screens. 2. The contractor is responsible for developing a detailed installation plan including timeline and coordinate with plant management to schedule installation activities. 3. Installation consists of preparing the installation site, including any necessary modifications to existing structures and ensure all safety protocols are in place and adhered to. 4. Contactor will install the two Vulcan Stair Screens as per manufacturer specifications and ensure proper alignment and secure mounting of screens, reconnect screens to existing electrical systems and verify electrical connections are compliant with relevant codes and standards, reconnect screens to existing control systems and ensure control systems are fully functional and integrated with the new screens, reconnect screens to existing wash press and ensure wash press operates correctly with the new screens. 5. Vulcan will provide the services of a factory employed service technician who shall adequately inspect the installation, test the equipment, and instruct the owner's operating personnel in its maintenance and operation; and will provide two (2) trips of four (4) days to inspect and certify operation.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.