Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

December 30, 2024

145 McDermot Ave

Renovation

No Information to Display

$100,000.00

Public - Federal

img_map_placeholder

145 McDermot Ave, Winnipeg, MB

7

13

Subscribe to View Full Documents

Replace all missing drywall from rooms 405, 433, and 428/429 (Priority) at the Customs Examining Building. The drywall to be installed and finished. (paint and trim) Ensure all current poly is in proper condition and setting to act as a proper vapor barrier. If it is not, to install proper vapor barrier. Paint, add baseboard, and reattach all cabinetry and baseboard heaters. Paint all walls that need reinstalling, to the proper finish for the areas (contractor to determine) low VOCs, likely afterhours as to not affect tenants (re: smells) Baseboards and trims to be installed where needed to match existing as best as possible. Uninstall, and reinstall tenant equipment associated to the walls in question. (sublimation dryer, washer/dryer for example) Replace any damaged or stained ceiling tiles associated with the work. Ensure work area is tidy and cleaned up after each work day. As much work as possible to be completed between Monday and Friday- most areas do not have active work in them. Any work with smells or excessive noise to be done after hours if that is determined at time. Room 405 - requesting entire room to be painted (no work to be done in 405A or 405B) - Room 433 - there will be lab equipment to dispose of here (details in bid documents) - Room 428/429 is an active room so work to be coordinated with employee (s) to allow daytime work. BGIS Property will have all the ceiling tiles installed prior to this project, any damage to tiles from project work will be responsibility of contractor. Request to have pressure treated plywood installed behind wall heaters, heaters will need to be removed off wall to complete work-reinstalled- shut off's on 3rd floor fyi. Electrical boxes - fire alarm will need to be remounted in areas. There will be some water lines to be capped where applicable when lab equipment is disposed off. All work must to be completed by December 2024 or sooner pending confirmation of material delivery. Question Deadline 09/13/2024 at 2:00 PM CT Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects