Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2024

October 14, 2024

November 4, 2024

1600 W Plum St

Asbestos Abatement, Demolition, Site Work

No Information to Display

$50,000.00

Public - State/Provincial

img_map_placeholder

1600 W Plum St, Fort Collins, CO

45

7

13

7

Subscribe to View Full Documents

Contractor will be responsible for providing all materials, equipment, labor, and services necessary to perform the selective demolition and abatement per the scope description below and per attached drawings and specifications. This portion of the project scope includes the demo and abatement of the following items in buildings 816-818 only: removal of existing blow-in fiberglass insulation, all gutters, asphalt shingle assembly including underlayment and roof sheathing, gable siding and sheathing, spray applied mold treatment to trusses, abatement of all flooring in units including underlayment in areas with wood subfloor and triple rinse treatment of concrete subfloors. Contractor must submit on type of mold treatment on trusses at time of award. Contractor MUST use care in removing base as to NOT damage walls during abatement. Reference Number 0000362057 Job Location: Fort Collins, CO Facilities Management at Colorado State University is seeking firm, competitive documented quote responses from qualified Contractors for selective demolition and abatement services. Facilities Management at Colorado State University is seeking firm, competitive documented quote responses from qualified Contractors to provide all labor, material, equipment, and services to complete the selective demolition and abatement as described in section G, Exhibit B and as shown in the attached construction documents. The project location is University Village Apartments, 1600 West Plum Street, Fort Collins, CO 80521. Question Deadline 09/13/2024 at 12:00 PM MT Questions are submitted online No, Vendors may submit questions by email to the Single Point of Contact prior to the Questions Due Date identified in the Basic Information and Timeline above. The Agency/Institution may answer some, all, or none of the questions asked by posting them publicly. Anticipated Contract Start Date October 14, 2024 Bonding Requirements - Bid Bond 5 % - Performance Bond 50 % - Labor and Materials Bond 50 %

52 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects