Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 25, 2024

October 25, 2024

No Information to Display

24699 School Rd

Site Work

No Information to Display

$818,000.00

Public - County

img_map_placeholder

24699 School Rd, Blythe, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

NO JOB WALK - PUBLIC PARK NOTE: PLANS WILL NOT BE PROVIDED FOR THIS PROJECT. EACH CONTRACTOR MUST TAKE THEIR OWN MEASUREMENTS. Location 24699 School Road, Ripley, CA 92225 DEADLINE FOR SUBMITTING QUESTIONS Monday, September 9th, 2024 at 4:00 PM. Overview: This Renovation Project will include, but is not limited to, any portion of the following: a. Initial planning and site review: Verify existing conditions at the site and all work needed to complete the project. b. Trim all large trees. c. Remove and dispose of all debris. d. Apply weed herbicide as needed. e. Remove all the weeds at the soccer field, grade the field flat and level. f. Plant 250 lbs. of Bermuda seed on the soccer field. g. Install new Goal nets to be 24' x 8'. h. Install 2 fabric shades over the playground. i. Paint over all graffiti on every structure throughout the park. j. Repair and replace any broken concrete slabs and concrete car stop parking bumpers. k. Perform a thorough inspection of the existing Irrigation system. Replace commercial valves, PVC pipes, sprinkler bodies and nozzles as needed in order to achieve optimal performance of the irrigation system. l. Prepare a detailed work plan indicating required and recommended improvements. m. Coordinate design and construction activities with HACR staff. n. Once approved, contractor shall complete the renovation of the Project according within the agreed upon timeframe.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.