Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2024

November 1, 2024

November 29, 2025

7000 Sonyea Rd

Renovation

No Information to Display

$500,000.00

Public - State/Provincial

img_map_placeholder

7000 Sonyea Rd, Sonyea, NY

10

20

3

Subscribe to View Full Documents

A. The Work of this Contract is being performed at a secure Correctional Facility. B. Any reference to the Contractor, subcontractors, suppliers and equipment manufacturers shall mean those entities and any/all of their employees. C. Contractor and any subcontractors, suppliers and equipment manufacturers must comply with and adhere to the Facilityís security regulations. A copy of the Facilityís security regulations will be distributed at the initial job meeting. 1. Any situation not covered by the Facilityís security regulations should be brought to the attention of the Directorís Representative, the Corrections Officer, and any assigned Facility staff. Replace Roof, Work Control Office, Building No. 87 Location/Physical Address Groveland CF 7000 Sonyea Rd Route 36 Sonyea, NY 14556-9700 Estimated Cost: $250,000 - $500,000 MBE Goal: 15% WBE Goal: 15% SDVOB Goal: 6% Each bid must be prepared and submitted in accordance with the Instructions to Bidder and must be accompanied by a bid security (i.e. certified check, bank check, or bid bond in the amount of $22,800 for C). All successful bidders will be required to furnish a Performance Bond and a Labor and Material Bond pursuant to Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract estimated to be between $250,000 and $500,000 for C. The substantial completion date for this project is 303 days after the Agreement is approved by the Comptroller. The Office of General Services reserves the right to reject any or all bids. For all other questions, please send an email to DCPlans@ogs.ny.gov, or call (518) 474-0203.

31 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.