Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 23, 2024
October 23, 2024
No Information to Display
1301 Beach Dr SE
Renovation
No Information to Display
$70,000.00
Public - Federal
1301 Beach Dr SE, St Petersburg, FL
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
ANIT-SWEAT INSULATION REMOVAL AND REPLACEMENT FOR CGC RESOLUTE. 5.2 Detailed Tasks: 5.2.1 The contractor shall remove and dispose of existing insulation in select areas. 5.2.2 Install approx. 680 feet of new insulation around select chill water and other lines ranging from 1/2 " - 4" in diameter in accordance with the publications listed in section 7 of this document. Insulation should be rated to minimize heat transfer over a 60 5.2.3 Valves Approx 20 CHW alone temperature differential with no condensation on the piping or exterior / interior of the insulation material.that may need replacing 5.2.4 Treat approx. 770 square feet of interior compartment vertical bulkheads to prevent all sweating in accordance with the publications in section 7. Bulkheads separating compartments with large temperature differences will be prioritized. 5.2.5 Replace and properly insulate approx. 20 linear feet of ducting that has corroded due to condensation. 5.2 Detailed Tasks: 5.2.1 The contractor shall remove and dispose of existing insulation in select areas. 5.2.2 Install approx. 680 feet of new insulation around select chill water and other lines ranging from 1/2 " - 4" in diameter in accordance with the publications listed in section 7 of this document. Insulation should be rated to minimize heat transfer over a 60 5.2.3 Valves Approx 20 CHW alone temperature differential with no condensation on the piping or exterior / interior of the insulation material.that may need replacing 5.2.4 Treat approx. 770 square feet of interior compartment vertical bulkheads to prevent all sweating in accordance with the publications in section 7. Bulkheads separating compartments with large temperature differences will be prioritized. 5.2.5 Replace and properly insulate approx. 20 linear feet of ducting that has corroded due to condensation.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
St Petersburg, FL
Bid Date: Oct 01 2024
St Petersburg, FL
--
St Petersburg, FL
Bid Date: Oct 08 2024
St Petersburg, FL
Bid Date: Oct 24 2024
St Petersburg, FL
Bid Date: Oct 08 2024
St Petersburg, FL
--
St Petersburg, FL
Bid Date: Oct 10 2024
St Petersburg, FL
Bid Date: Jan 09 2024
St Petersburg, FL
--
St Petersburg, FL
Bid Date: Sep 14 2023
St Petersburg, FL
Bid Date: Feb 18 2020
St Petersburg, FL
Bid Date: Oct 23 2023
St Petersburg, FL
--
St Petersburg, FL
Bid Date: Oct 18 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
