Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 25, 2024

October 25, 2024

September 30, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$356,000.00

Public - City

img_map_placeholder

Multiple Locations, Worcester, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

18

Subscribe to View Full Documents

Scope: resurfacing of tree wells in the Polar Pakr area per plans and specifications of DPWP MaDOT prequalification required: Pavement Surfacing Bid Security (5% of Total Bid) All questions must be referred in writing to Chris Gagliastro via e-mail at gagliastroc@worcesterma.gov Question Deadline 09/20/2024 MassDOT prequalification of contractors with the class of work as Pavement Surfacing for the project with an estimated value of $ 356,000,.00 will be required. SCOPE OF WORK All work, under contract, shall be performed in accordance with Division II and III of the latest edition of the Massachusetts Standard Specifications for Highways and Bridges as amended, except as otherwise required in these specifications. Unless otherwise specified, the work to be completed under contract, consists of the furnishing of all equipment, labor and materials and performing all work in strict compliance with these specifications for the construction of SUPERPAVE bituminous concrete pavement, drainage pipe, removal of designated trees, adjusting frames and covers and all else specified herein, together with all appurtenances. The work is located in the City of Worcester, Massachusetts, in the street noted in the proposal. All work shall conform to the standards and specifications on file with the City of Worcester, Department of Public Works and Parks Engineering Division, and any changes, drawings, plans and written directions that may, from time to time, be issued by the Contracting Officer

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.