Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 4, 2024

December 6, 2024

June 9, 2025

4001 Discovery Dr

Renovation

No Information to Display

$82,840.00

Public - State/Provincial

img_map_placeholder

4001 Discovery Dr, Boulder, CO

21

29

47

2

Subscribe to View Full Documents

Reference Number 0000361274 Job Location: Boulder, CO The University of Colorado Boulder has purchased an electron beam writer (i.e. e-beam writer) which will require modification of an existing 300 SF cleanroom within the SEEL Building to house the new clean room cabin, e-beam writer, and associated equipment. Associated scopes include but are not limited to: Demo, Finishes, Fire Sprinkler, Plumbing, HVAC, and Electrical. This project will be solicited under a 2-Step RFP/DBB. This solicitation is for Step 1 to pre-qualify a pool of Contractors who have the the appropriate experience and team for this project. These Contractors will be invited to conventionally bid the project in Step 2 with the intent of awarding to the lowest responsible bidder. Pre-qualification and inclusion on the select bidders list will be necessary for bidding this project. This pre-qualification process is unique to this project and not withstanding other pre-qualification by the State Buildings Division and the University of Colorado, all contractors wishing to bid this project must be pre-qualified as defined in this document. Question Deadline 09/24/2024 at 5:00 PM MT Questions are submitted online Yes, Respondent initiated email requests for clarification will be received any time on or before to Joshua.porosky@colorado.edu and monika.magenheim@colorado.edu Contract Execution 12/2/24 Notice to Proceed 12/6/24 Construction Mobilization 2/17/25 Substantial Completion 5/9/25 Final Completion 6/9/25 The State reserves the right to reject any or all proposals on the basis of being unresponsive to this RFP or for failure to disclose requested information.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.