Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

October 24, 2024

April 22, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$1,712,000.00

Public - City

img_map_placeholder

Multiple Locations, Muskogee, OK

56

12

7

4

Subscribe to View Full Documents

Drainage Improvements and Street Improvements Country Club Road Reconstruction with 8" P.C. Concrete Dowel Jointed Pavement Construction of 3 - 10' x 5' x 71' LG Rectangular Concrete Box Culvert Includes water and sewer relocation. No bid may be withdrawn for at least sixty (60) days after the scheduled closing time for receipt of bids. Each proposal must be accompanied by a Bidder's Bond, or Cashier's Check upon any solvent Bank or Trust Company, payable without reserve to the Muskogee Municipal Authority, Muskogee, Oklahoma, in an amount not less than five percent (5%) of the total amount of the bid. Bid security of the two low bidders will be retained until approval of contract and execution of satisfactory bonds by the successful bidder, or until other disposition on the bids is made. The bonds required will be a Performance Bond, a Payment Bond, and a Maintenance Bond, each in the full amount of the contract. The Authority will not accept letters of credit in lieu of any bond required herein. The Owner reserves the right to waive any informalities in the bidding. Conditional bids will not be accepted. No bid may be withdrawn after the scheduled closing time for receipt of bids for at least Sixty (60) days. The bid may be extended for a period of 30 days by mutual agreement of the bidder and the Owner. The attention of all bidders is called to the fact that they must meet the requirements and bid in accordance with the laws of the State of Oklahoma governing public works contracts. The Muskogee Municipal Authority reserves the right to evaluate bids, to reject any or all bids, and to waive any informality in any bid. Question Deadline 09/20/2024 All questions about the meaning or intent ofthe Contract documents shall be submitted to Engineer in writing

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.