Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

September 30, 2024

March 28, 2025

2100 E Calumet St

Addition, Demolition, Site Work

No Information to Display

$837,000.00

Public - City

img_map_placeholder

2100 E Calumet St, Centralia, IL

23

23

20

5

Subscribe to View Full Documents

Documents prepared by FGM Architects, Inc., 475 Regency Park, Suite 325, O'Fallon, Illinois 62269; phone 618.624.3364; fax 618.624.3369. PROJECT DESCRIPTION Work consists of constructing an exercise room addition to the existing Storage Building at Centralia High School and all associated work. Contract documents may be examined on and after September 4, 2024. Additional shipping/ handling charges may apply and are non-refundable. Contact Snow Printing for exact shipping/handling charge. CONTRACT TYPE Bids will be based on a single lump sum general construction contract. Bids shall include not less than the prevailing hourly wage rate determined by the Illinois Department of Labor. Bid Security is required in the amount of Ten percent (10%) of Proposal, made payable unconditionally to the Owner. Security shall be certified check, cashier's check or bid bond issued by surety licensed to conduct business in the State of Illinois. Within ten (10) days after notification of award of contract, the successful Contractor shall furnish a Performance Bond and Payment Bond in the amount of 100 percent of the contract and the payment of all obligations arising thereunder using a form similar to the AIA 312 Form, or one acceptable to Owner. The Performance Bond will become a part of the Contract. The failure of the successful bidder to enter into contract and supply the required bond and Certificates of Insurance within ten (10) days after the prescribed forms are presented for signature, or within such extended period as the Owner may grant, shall constitute a default. The Owner reserves the right to accept or reject any or all bids, to waive any informalities and irregularities in any bid, or to make awards in the best interests of the Owner, Question Deadline 09/18/2024 Submit written questions to be addressed at Prebid meeting minimum of two business days prior to meeting.

30 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects