Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2024

April 1, 2025

July 27, 2025

To Be Determined

Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

To Be Determined, Barrington, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

19

Subscribe to View Full Documents

Exterior: Abrasive blast clean to a SSPC-SP6 commercial standard within containment. Apply a four (4) coat zinc epoxy urethane system. Wet Interior: Abrasive blast clean to a SSPC-SP10 near-white metal standard. Apply a three (3) coat zinc epoxy system. Dry Interior: Abrasive blast clean the entire tops of the platforms (including 1 ft. up the riser wall), the entire baseplate, and spot coating failures throughout to a SSPC-SP6 commercial standard. Apply a two (2) coat epoxy system to the prepared surfaces. Pit Piping: Abrasive blast clean to a SSPC-SP6 commercial standard. Apply a two (2) coat epoxy system. Foundation: Repair grout. Abrasive blast clean and apply a two (2) coat epoxy system. Repairs: 1) Replace the access tube manway gasket. 2) Install handholds at the wet interior roof hatch. 3) Replace the expansion joints on the fill pipe and draw pipe. 4) Retape loose insulation on the fill pipe and draw pipe, replace missing vapor barrier. 5) Replace the mud valve. 6) Install a flap gate on the overflow discharge. 7) Adjust the fall prevention device on the dry interior access tube ladder. 8) Basebell and riser ladder cage removal. 9) Install a seal at the access tube air gap. 10) Install a painter's railing. 11) Weld a rigging lug on the bowl. 12) Install cable mounting brackets in the dry interior access tube. 13) Remove abandoned antenna mounts on the upper riser. 14) Replace the aviation light. 15) Replace the dry interior light bulbs. The structure is a 400,000-gallon spheroid elevated water storage tank with a low-water level of 103 ft. located at 100 Manchester Dr. in Barrington, Illinois. Exterior: Abrasive blast clean to a SSPC-SP6 commercial standard within containment. Apply a four (4) coat zinc epoxy urethane system. Wet Interior: Abrasive blast clean to a SSPC-SP10 near-white metal standard. Apply a three (3) coat zinc epoxy system. Question Deadline 09/25/2024 The Bidder shall submit all questions about the meaning or intent of the Bidding Documents to DIXON in writing. Contact information and submittal procedures for such questions are to be made to the Issuing Office. 7.03 Interpretations or clarifications considered necessary in DIXON's sole judgement, in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answer

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.