Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 25, 2024

October 25, 2024

January 23, 2025

To Be Determined

Paving, Site Work

No Information to Display

$222,000.00

Public - City

img_map_placeholder

To Be Determined, Lake Havasu City, AZ

3

6

2

5

Subscribe to View Full Documents

This project consists of a Base Bid which includes the Contractor performing approximately 4,000 square yards of subgrade preparation, aggregate base course and asphalt concrete pavement installation at Dick Samp Park. This project requires contractor to supply, haul, install, grade and compact subgrade and base material of 4" A/B material, supply, haul, install and compact of 2" thick hot mix asphalt concrete pavement over the area as described herein. Subgrade preparation, aggregate base course, asphalt concrete pavement installation will be per Lake Havasu City Specifications. All excess material will be hauled away and disposed of by the Contractor and will be considered incidental to the project. Any damage to the existing concrete islands shall be repaired by the Contractor and will be considered incidental to the project. The contractor will be responsible for scheduling this project with the City Representative in a time frame not to exceed 90 calendar days. Work will require the contractor to provide the necessary labor; supervision; supply, hauling, installation of all necessary materials and other related materials; mobilization; demobilization; tools and equipment; insurance and Workers' Compensation as required for saw cutting as specified in this ITB. Any asphalt work that is deemed unacceptable by the City Representative shall be removed and replaced at the contractors' expense. It is anticipated that this work will begin in October/November 2024. It shall be understood that Lake Havasu City is under no obligation to award the project. The contractor must supply all A/B base material for final grade and supply the Hot Mix Asphalt Concrete for this project. Question Deadline 09/18/2024 at 3:00 PM MT All questions that arise relating to this solicitation shall be directed in writing to purchasing@lhcaz.gov with a copy to engineeringinfo@lhcaz.gov. To be considered, written inquiries shall be received at the above-referenced email address by Inquiries received will then be answered in an Addendum.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.