Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 17, 2024
October 1, 2024
September 30, 2025
Multiple Locations
Service, Maintenance and Supply
No Information to Display
No Information to Display
Public - Federal
Multiple Locations, Priest River, ID
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Priest Lake Road Maintenance and Heavy Brushing Project (i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation (FAR), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) This solicitation is issued as a Request for Quotation (RFQ). (iii) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-05. (iv) This procurement is a total small business set aside. The NAICS code is 115310 and the Small Business Size Standard is $11.5 million. 1.0 Background and Purpose The Forest Service requires road improvement maintenance as well as heavy brushing to be performed within Priest Lake, ID. There will be a total of approximately 18 miles of heavy brushing, and 1.2 miles of roadway excavation / road improvement requirements, with an additional line item of an hourly excavator rate. 3.0 Technical Requirements / Tasks 3.1 Heavy Brushing: The contractor shall cut vegetative growth including trees six (6) inches or less in diameter (when measured 6 inches above the ground) which interferes with the sight distance and drainage features along the roadway. The contractor shall remove all logs and windfall within the specified clearing limits. The clearing limits are shown in the attached typical section. This includes a horizontal distance of ten (10) feet, (or a slope distance of 12 feet) from the bottom of the ditch for the roads with ditches, eight (8) feet horizontal distance (or a slope distance of 12 feet) from hinge without ditch, and a horizontal distance of four (4) feet (or a slope distance of six (6) feet) from the shoulder of the fill side. Clearing shall include turnouts and curves. The clearing limits are shown in the attachment 1. 3.2 Roadway Excavation: 3.2.1 Roadbed Clearing and Grubbing: This work consists of clearing and grubbing vegetation, standing trees, and the removal of logs and windfall within the roadbed, shoulders, turnouts, intersections, ditches, drainage dips, catch basins, surface water deflectors and minor drainage structures. Remove vegetation and obstructions from the work area which interfere with sight distance, road surface maintenance, drainage feature maintenance, and drainage features. Roadbed clearing vegetation stumps do not exceed two (2) inches in height and 1 (1) inch in diameter and shall be cut as not to create a hazard to foot or vehicle traffic or impede roadbed surface maintenance. Vegetation greater than 3 in length and 2 diameter shall be scattered outside of the work area and water courses. Slash and debris shall be scattered downslope from the roadbed and outside of the clearing limits, avoiding any concentration. Remove organic, deleterious, and material larger than 6 inches brought to the surface during clearing and grubbing. Repair soft and unstable areas. Shape to a uniform surface and compact with approved equipment. Please reference the attached full combined solicitation synopsis for all the details, including documentation required for quote submissions. Period of Performance: October 1st,2024 through September 30th, 2025.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Priest River, ID
Bid Date: Oct 17 2023
Priest River, ID
Bid Date: Aug 17 2023
Nampa, ID
Bid Date: Oct 01 2024
Boise, ID
Bid Date: Oct 21 2024
Bonners Ferry, ID
Bid Date: Oct 03 2024
Lewiston, ID
Bid Date: Aug 13 2024
Twin Falls, ID
Bid Date: Sep 18 2024
Blackfoot, ID
Bid Date: Aug 20 2024
Boise, ID
Bid Date: Sep 11 2024
Boise, ID
Bid Date: Sep 25 2024
Lewiston, ID
Bid Date: Sep 26 2024
Blackfoot, ID
--
Nampa, ID
Bid Date: Oct 01 2024
Middleton, ID
Bid Date: Sep 03 2024
Caldwell, ID
Bid Date: Oct 01 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
