Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

November 25, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$4,262,794.00

Public - City

img_map_placeholder

Multiple Locations, Hurricane, UT

73

11

4

2

Subscribe to View Full Documents

The Work to be performed under this project shall consist of furnishing all labor, materials and equipment required to construct the facilities and features called for by the Contract Documents and as shown on the Construction Drawings. Project location is in Hurricane, Utah along the 100 North corridor from 200 West to SR-9 and along 100 East from SR-9 to 100 North. Work consists of typical roadway construction including removal of existing features, site clearing, roadway excavation, base course, asphalt, curb and gutter, pedestrian ramps, sidewalk, water, sewer, storm drain, signing and striping, joint utility trench, etc. Bid Security shall be furnished in accordance with the Instructions to Bidders. We understand that the proposed construction will consist of the reconstruction of 100 North from 200 West to SR-9, new construction of 2800 West from 100 North to 600 North, and new construction of 700 West from 100 North to 400 North in Hurricane, Utah. 100 North is classified as a 66-foot historical minor collector, and 2800 West and 700 West are classified as 70-foot major collectors. Reconstruction of 100 North will also include updating and replacing sewer and water lines and other utilities. Construction of the new roadways 2800 West and 700 West will include installation of sewer and water lines and other utilities as well. Construction of 2800 West and 700 West will also include additional 4 feet of gravel shouldering on each side of the roadways with appropriate cut/fill slopes

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.