Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 15, 2024

December 16, 2024

August 31, 2026

To Be Determined

Site Work

No Information to Display

$1,000,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Stony Plain, AB

30

9

4

3

Subscribe to View Full Documents

BRIDGE REPLACEMENT AND OTHER WORK 16:12 B.F. 75195E/W - Hwy 16 over Hwy 43 Interchange, 2 km N of Carvel NORTH CENTRAL REGION APPROXIMATE QUANTITIES: 1 Lump Sum Traffic Accommodation for Bridge Construction 1 Lump Sum Demolition and Disposal of Bridge Structures - Stage 1 1 Lump Sum Demolition and Disposal of Bridge Structures - Stage 2 1 Lump Sum Headslope Modifications 1,380 Square Metres Concrete Slope Protection 1 Lump Sum Pier Modifications 513 Cubic Metres Concrete (Class HPC) - Supply and Place 1 Lump Sum Structural Steel - Supply and Fabrication, Delivery and Erection 2,895 Tonnes Asphalt Concrete Pavement - EPS Mix Type H2 (PG 58-28) 95 Metres Culverts - Supply and Install (1 200 mm dia. C.S.P.) Contractor to supply all materials.

95 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.