Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 17, 2024

September 23, 2024

November 15, 2024

14833 Avalon Ave

Renovation

No Information to Display

$3,378,941.00

Public - City

img_map_placeholder

14833 Avalon Ave, Dolton, IL

88

30

27

4

Subscribe to View Full Documents

sealed bids will be received for Interior Renovations at Berger Vandenberg School, 14833 Avalon Ave, Dolton, IL 60419, in the following bid categories: Bid Package #3 - Masonry; Bid Package #4 - Carpentry and General Construction; Bid Package #5 - Flooring; Bid Package #6 - Painting; Bid Package #7 - Plumbing; Bid Package #8 - HVAC; Bid Package #9 - Electrical; and Bid Package #10 - Data and Low Voltage. All proposals or bids offered must be accompanied by a bid bond in a form acceptable to the school board, cashiers check, or certified check made payable to the Owner in the amount of not less than five percent (5%) of the total amount of the proposal as a guarantee that if the proposal is accepted, a contract shall be entered into and the performance of the contract is properly secured. No bid shall be withdrawn after the opening of the proposals without the consent of the Owner for a period of sixty (60) days after the scheduled time of closing bids. The successful Bidder of the construction of the improvement will be required to file a performance and payment bond equal to one hundred percent (100%) of the contract, with sureties to be approved by the Architect, which performance bonds shall be conditioned upon proper and faithful performance by the Contractor of the work specified in accordance with the plans and specifications therefore, according to the time and terms and conditions of the contract: and also that the successful Bidder, now the Contractor, shall properly pay all debts incurred by the Contractor in the execution of the work, including those for labor and material furnished for himself and all of his subcontractors. The bonding company shall have a minimum rating of A- 9 in accordance with Bests Key Rating Guide - Latest Edition. The Contractor shall be required to furnish sufficient insurance or guaranty of indemnity to School District 149 against any and all claims which might arise for damages to persons or property due to the negligence of the Contractor or Subcontractors, or their officers, agents, employees or servants, during the construction of said improvement and until the said improvement has been finally accepted as complete by the School District 149. The Owner reserves the right to reject any and all proposals or bids. Bid Result. Masonry:Piazza & Mannerino Masonry, LLC. $139,000.00 Carpentry & General: Joseph Construction Co. $1,365,110.00 Flooring: Tiles in Style, LLC $257,871.00 Painting: Cosgrove Construction, Inc $99,625.00 Plumbing: Reichelt Plumbing, Inc. $124,000.00 HVAC:Budd Mechanical, Inc. $688,635.00 Electrical: Kreykes Electric, Inc. $426,000.00 Data & Low Voltage: Greatline Communications $278,700.00

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.